Release the production information
Reconcile the bill of materials, quantity schedule, finish references and drawings. Confirm any long-lead hardware and powered components. Record approved substitutions before procurement or fabrication proceeds.


FOCUS PROJECT KNOWLEDGE
Connect drawings, material preparation, fabrication, finishing and assembly through a controlled fixture schedule.
Reconcile the bill of materials, quantity schedule, finish references and drawings. Confirm any long-lead hardware and powered components. Record approved substitutions before procurement or fabrication proceeds.
Coordinate panel cutting and edging with metal fabrication, glass and acrylic preparation. Check the critical dimensions that affect adjoining units, doors and removable inserts. Keep visible finish surfaces protected between operations.
Prepare surfaces for the approved paint, laminate, veneer or metal finish. Add specified graphics, lights and hardware while preserving service access. Verify that labels and cable routes match the released configuration.
Trial-fit the agreed modules and review alignment, moving parts and electrical integration. Record defects with fixture identifiers, confirm the corrective action and recheck the affected function before packing.

A documented cooperation process connects your store brief, quotation, design approval, manufacturing and opening-day handoff.
Read the process →
Choose the layout from the stock, customer journey and daily staff work before fixing the cabinet count.
Read the process →
Use a clear hierarchy for new releases, premium cards, everyday stock and complementary accessories.
Read the process →Share your floor plan, card formats and opening target. We will connect the display systems to your selling, storage and service needs.